 Site Map Employment
mobile device |
The Motoman EA1900TN overhead mounted robot setup for welding was purchased in May 2007.
Our robot cell is configured with 3 stations. Station 1 and Station 2 are setup for light to medium weight weldments with 6,000LB headstock and tailstock combination. Where as Station 3 is setup with a fixed machined base that accepts interchangeable fixtures depending on the product that is currently in production.
Our cell is a unique and customizable:
- Coordinated motion where the boom will move and rotate during welding. This allows the weld joint orientation to the welding torch.
- Customized fixturing and tables to accommodate even the most unique customer requirements.
- Weld wire is run from 500LB barrels or 50LB spools depending on how large the production run.
| Robot welding has brought unique dimensions to Custom Engineering and expanded our capabilities extensively. | The photos above are of a large production run that we moved from manual welding to robotic welding. Start to finish of this product was 1-1/2 hours by robot or 6 hours manually. This particular job used the full capabilities of one of our rotating stations. Wire was fed from a 500LB barrel.
|
Tags: Fabrication Equipment, Fabrications and Weldments, Large Fabricated Weldments, Platens, Welding Overlays (robotic welding home)
Page last updated: 2010-01-12 13:18:21 |
|